ADU Construction & Conversions

Turn existing garages into new apartments.

Three-story tan and blue apartment building with balconies, stairways, accessible parking, and reserved parking spaces.

From garages to living spaces

Featured Project, Fremont California

60 ground floor garages converted into 30 new apartments.

Our Role

Working from client-provided plans, AHE managed and completed all construction to convert 60 garages into 30 new apartments.

Scope of Work

• Structural modifications
• Plumbing and electrical installation
• Floor vapor barrier system and leveling topper
• New windows and HVAC systems
• Complete kitchens, bathrooms and interior finishes
• New concrete pathways in front of the apartments
• Refinishing of all siding

The Transformation

Unfinished interior construction with metal wall framing, exposed electrical wiring, insulation, and a Siemens electrical panel.
Black PVC plumbing pipes installed in a concrete floor trench of a wood-framed building under construction

Interior framing

Modern white U-shaped kitchen with stainless steel appliances, subway tile backsplash, quartz countertops, recessed lighting, and light wood flooring.

Plumbing rough-in

Completed apartment interior