AHE installs insulation, upgrades HVAC systems and completes energy improvements across multifamily communities.

Featured Project, Burlingame CA

10 buildings · 160,000 square feet · Completed in 40 days

Insulating beneath the apartments

AHE insulated the parking garage ceilings beneath residential units across ten buildings. The project combined closed-cell spray foam with fire-protective and finish coatings to create a complete insulation system.

Our Role

AHE managed the installation from surface preparation through final coating, providing the labor, materials, equipment and supervision to complete the project in 40 days.

Scope of work

  • Protecting garage floors, equipment and surrounding surfaces

  • Installing two inches of closed-cell spray foam insulation, providing R-15 insulation

  • Applying a fire-protective coating over the exposed foam

  • Adding a protective finish suited to garage conditions

The Installation Process

Underground parking garage with exposed plumbing pipes, concrete ceiling, support columns, and parked cars
Electrical meter bank with multiple utility meters covered in protective plastic inside a cinder block building

Before Insulation

Interior of a building under construction with concrete columns, exposed pipes, plastic sheeting, and a worker in an orange safety vest

Protecting equipment

Insulated garage ceiling